Seiko Forged Harvester Knife Protector Agricultural Accessories

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Specifications

Model NO.
DF010812
Material
High Carbon Steel
Corrosion Resistance
High Corrosion Resistance
Surface Finish
Polished
Accuracy
0.01-0.03mm
Roughness
0.63-0.16μm
Strength
High Strength
Tolerance
Precision Tolerance
MOQ
1000PCS
Capacity
500000 PCS/Year

Product Description & Gallery

TypeAuto Forgings / Truck Forgings / Railway Forgings / Excavator Forgings
ApplicationAutomobile, construction machinery, railway, petrochemical industry, etc
Material4140/SCM440/42CrMo, ssw-QIR/65#steel, 65Mn, 50SiMn, QT800, ZG35SiMn, SSW-Q1
ProcessForging + Machining + Surface Treatment
Quality ControlUT, MT, RT, PT, chemical composition test, mechanical property test, etc.
Heat TreatmentQuenching and Tempering
CoatingBlack Oxide + Rust-proof oil
StandardASTM, ASME, DIN, JIS, ISO, BS, API, EN, GOST, etc
CertificatesRaw material certificate, Heat treatment report, Dimension inspection report, UT/MT test report
Competitive AdvantageStrict quality control and management across the entire production process from smelting to final inspection.

Frequently Asked Questions

How long does it take to receive samples?
Pattern development takes 30-45 days after the order, and samples are typically ready 30 days after the pattern is finished. Note that this does not include transportation time.
What is the new product development process?
The process includes tooling and sample orders with a 50% deposit, departmental meetings for scheduling, in-house design of molds and fixtures, material procurement, machining, and final inspection before sample dispatch.
How long is the manufacturing lead time for mass production?
Mass production generally takes 90 days after sample approval. We can arrange expedited production schedules for urgent customer needs.
How do you manage quality problems?
We perform APQP at the early project stages, conduct patrol inspections during production, and perform final audits on packed goods before shipping.
What are the standard payment terms?
Initial stages require 50% of the tooling fee in advance. For production, we prefer a 50% deposit and the balance via T/T before shipment. Terms are negotiable for long-term partners.
How long does international shipping take?
Shipping by sea to Europe takes about 6-7 weeks (including customs), while the US takes 2-3 weeks depending on the coast. Air freight typically takes 7 days to major global destinations.

Customization Notice:

All parts are custom made according to drawings or samples. Please provide technical drawings including material marks, product weight, and purchase quantities for an accurate and reasonable price calculation. We are dedicated to providing you with quality products and services.

Related Products